Home | Contact | Sitemap
ERTMS Technology ERTMS Services ERTMS Projects
ETCS Level 1 LS
 
ETCS Level 1 LS

The train control system used in Switzerland at present (ZUB) was designed on the basis of an analysis of hazards, i.e. additional safety measures were implemented at high-risk signal locations to monitor trains by means of a braking curve. All other, (less hazardous) locations, are equipped with warning/stop signalling (SIGNUM).

ETCS Levels 1 and 2 are not scalable, i.e. all route locations have to be equipped with speed monitoring in “full supervision” mode. It is not, therefore, possible to implement simplified supervision of the type currently used.

Together with other railways, SBB submitted a change application to the European supervisory authority, AEIF, requesting a “limited supervision” mode. ETCS Level 1 Limited Supervision (L1LS) permits scalable functionality whereby each signal location can be equipped to the desired safety level.

It is anticipated that the Limited Supervision mode will be incorporated into the ETCS standard as part of a regular release upgrade to SRS 3.0.0.



» Print this page
 
Our services
ETCS-Strategy.
Elaborating integral migration concepts.
» more
 
Success.
Professional methods and many years of experience.
» more
 
 
 
 
Our projects
ETCS netwide by 2015.
Economical migration in Switzerland with L1LS.
» weiter
 
ETCS EuroCab.
ETCS for passenger- and cargo-transportation.
» more
 
 
 
SBB CFF FFS
Technical requirements | Imprint | Legal information | Data protection