|
|
| Implementation & commissioning |

- We perform design and project work for the ETCS system while paying due attention to operating requirements (such as type of traffic and train headways and speeds) and assist suppliers with system development work.
- Based on the required performance criteria, we implement GSM-R and ETCS L2 integration while observing the defined Quality of Service (QoS) parameters.
- Together with the customer, we design the operating processes for ETCS in harmony with current operating procedures that are applicable to the legacy train protection systems.
- Based on the defined operating processes under ETCS, we define test cases, draw up test scenarios and evaluate the tests performed.
- We use modern training methods and a modular course structure to prepare personnel for ETCS operation. Based on experience of training over 2750 employees, we draw up training programmes and design training documentation. A full training curriculum with detailed learning goals forms the basis for successful staff training and subsequent examination.
|
|
|
|
|
|
|
|
| Our projects |
 |
Gotthard Basetunnel. ETCS for the world’s longest rail tunnel. » more |
|
| |
 |
ETCS EuroCab. ETCS for passenger- and cargo-transportation. » more |
|
| |
|
| |
|
| |
|
|
|
|
| The technology |
 |
ETCS Level 2. Cab signalling and high speed. » more |
|
| |
 |
L1 Limited Supervision. The benefits of a simplified level 1. » more |
|
| |
|
| |
|
| |
|
|
|